The Blog.
How Auditors Should Evaluate IPC Class 3 and Space Addendum Flow-Downs
Auditing IPC Class 3 and Space Addendum requirements can be confusing.
A drawing may call out IPC-A-610 Class 3, IPC/WHMA-A-620...
Does a Drawing Note Require Every Operator and Inspector to Be IPC Certified?
In electronics manufacturing, drawing notes often reference IPC standards.
A drawing may state that a product must meet:...
IPC Certification Does Not Prove Product Conformance
In the first article of this series, we discussed what it means when a drawing calls out IPC Class 3, IPC/WHMA-A-620, IPC-A-610, IPC-A-600, J-STD-...
What Does It Mean When a Drawing Calls Out IPC Class 3 or Space Addendum?
In electronics manufacturing, drawing notes matter.
A single note may call out:
- IPC-A-610 Class 3
- IPC/WHMA-A-620 Class 3...
Inspection & Verification: Confirming That Quality Has Been Built In
Throughout this series, we've followed the complete manufacturing journey:
User needs became customer requirements.
Customer re...
The Correct Path to IPC/WHMA-A-620 Space Addendum Certification
IPC/WHMA-A-620 Space Addendum questions are becoming more common.
Students, companies, auditors, and training coordinators often ask:
...ElectroSpec’s High-Reliability Soldering Course Approach
ElectroSpec’s High-Reliability Soldering course is designed for real manufacturing needs, not just classroom theory.
The course is offered on...